NORSMAN GOLD PROJECT
Multiple Mining Centres Provide Long Mining Pipeline
800km2 position with 70 km along strike of one of Australia’s most significant goldfields.
Less than 30% of known Mineral Resource areas drilled for Ore Reserve conversion to date.
Current Operations
1.2MTPA processing plant.
Two active underground mines.
Rehabilitating Bullen decline to enable re-entry to the high-grade Mainfield.
Open pits recommenced at Princess Royal in March 2025.
Huge upside Potential
Pantoro’s work represents the first systematic drilling and exploration nearly 3 decades – yielding strong results. Project Ore Reserve now stands at 949,000 ounces.
Pantoro’s growth strategy aims to add high-grade underground mines to increase production to +200,000 oz per annum in the medium term. Exploration drilling from surface re-commenced in September 2024.